[1]
D. Antonijević, “THE RITUAL OF STARTING THE ASSEMBLING BELT IN THE FACTORY FOR »JUGO 55 GV« PRODUCTION ”, pea, vol. 7, no. 1, pp. 39–46, Dec. 1986.